Nozhenko Kostiantyn Danylovych after graduating from the Thermal Power Engineering Faculty of KPI in 1967 worked on the construction and operation of Kyiv CHP-6, then – in the management of “Kyivenerho”, since 1983, Assoc. branch laboratory of TEU of the Ministry of Energy of the USSR at KPI – was engaged in creation of the complex automated system of technical diagnostics of power units of 300 MW and its introduction on Zuevskaya GRES-2.
From 1989 to 1998 he worked at the Chernobyl Shelter to eliminate the consequences of the Chernobyl accident. Since 2000 – Head of Laboratories of the Department of ATEP TEF.
He was awarded the honorary badge “Excellence in Energy of Ukraine”.
Measuring in Industry
100%